G-Park Anagni

Kontractor by Kopron S.p.a.

G-Park Anagni

Construction of a build-to-suit logistics warehouse for the client GLP Italy

G-Park Anagni 2

The project

Sector: Logistics
Client: GLP Italy
Year of construction: 2023
Location: Anagni (FR)
Object of the contract: Turnkey construction

After acquiring the Colleferro contract, the GLP client entrusted us with the construction of the logistics platform in Anagni as well. We are delighted with this decision as it confirms the trust and further strengthens the partnership with this major international developer. We will build this new warehouse as if it were our own, with the same passion that has always characterized us because the esteem shown by the client deserves to be honored with professionalism.

Vincenzo Monterosso | Project Manager Kontractor by Kopron

Main features of the project:

  • Property area: 21,867 sqm, including 774 sqm dedicated to offices and common areas
  • External areas covering approximately 49,000 square meters
  • 22 loading bays
  • A stocking area with a height of 12 meters and a floor load capacity of 7,000 kg/sqm
  • Thermal insulation for the facades
  • A highly efficient PIR (Polyisocyanurate) roof
  • Building Management System (BMS)
  • Photovoltaic installation on the roof
  • Dimmable LED lighting with provisions for sensors
  • Rainwater harvesting tank for irrigation purposes
  • Electric vehicle charging points
  • Environmental mitigation and requalification interventions, including reforestation
  • Measures aimed at preserving biodiversity (e.g., bug hotel)
  • Breeam Excellent certification

Contact us to discuss your requirements